Management Audits for Shopping Centres
Revision of documentation and contracts; visits to the Centres; analysis of management requirements; analysis of real requirements regarding maintenance, personnel, scope of the technical maintenance, safety, cleaning contracts, etc.; fitting contracting to the real needs; contracting management; optimisation reports and proposals; updating contracts.
The saving proposed by dokei RE, according to the offers received, was 15% (1.114.634,42€). The final consensus proposal was a saving of 9,50% (784.000€).
Portfolio management 8 buildings offices CCAA Madrid
Total surface area: 75.340,00 m²
Industrial Warehouse Maintenance Management
Total surface area: 400.000m².
The main objective of the service is to ensure, within the warehouse management operation, a methodology and systematic approach to guarantee the best service.
Technically, the following are carried out: installation and equipment control; design and planning of operations; procedures and methods; ensuring regulation-legal compliance and programming and implementation.
Management or administration: of contracting; of documentation and administrative management.